Afeno ***********

  • Inspection/Quality Engineer
  • Updated 1 year ago
NDT or Inspection Qualification:

API 510. 570, 653, CWI, MFL, AET - Level 1, ASNT L2 MT, PT, UT, ISO 9001:2015

AFENO OMOVORIEDOH,

26 Chief Alex Wele, Nkoplu – rumigbo,

Port Harcourt, River State, Nigeria

+234 703 853 7308 +234 811 816 1892

[email protected]

Personal information
Sex:     Male

State of Origin: Delta State

Nationality: Nigerian
Date of Birth: 17 Aug 1991

PROFILE
Ø  Conversant with the requirement of ASME V, ASME VIII, ASME IX and B31.3.

Ø  Fully conversant with API 510, 570, 653, 650 and 1104.

Ø  Conversant with the requirement of ISO 9001; 2015 Quality Management System.

Ø  Sound knowledge of materials and Basic and Advance NDT techniques and their application.

Ø  Experienced in UT weld scanning, Hardness testing, welding inspection

Ø  Experienced in P&ID and ISO Drawings interpretation, preparation of ITP

Ø  Extensive experience in jetty inspection, Derrick Inspection, Drop Survey and Bolt Inspection.

Ø  Knowledgeable and experience in identification of internal and external corrosion/damage mechanism, risers, process piping, heat exchangers, Storage tanks and supports, valves, Fittings, insulations.

Ø  Knowledgeable and experienced in basic calculations such as minimum wall thickness for heat exchangers, vessels & piping and Tank design calculation

Ø  Experienced in rigging and lifting of materials and equipment.

Ø  Skilled in Computer use, particularly MS Word, MS Excel, MS PowerPoint and AutoCAD.

Professional achievement
ü  API 510 (68548), 570 (57952), 653 (74537)

ü  AWS – Certified Welding Inspector (16031461)

ü  ISO 9001: 2015 – QMS Lead Auditor (LAC/Q10021)

ü  IRATA Level 2 (2/99493)

ü  BOSIET (T1650696791),CA-EBS, DPR OSP (167729)

ü  ASNT Level II – (UT, MT, LPT)

ü  AET – Acoustic Emission Testing (in view)

ü  Magnetic Flux Leakage, MFL (in view)

Professional MEMBERSHIP
American Welding Society (AWS)

Education
National Youth Service Corps                                                                                    2013 – 2014

 

University of Port Harcourt,                                                                                        2008 – 2012

Rivers State, Nigeria

B.Sc. Mathematics and Statistics Second Class Upper Division

 

Sure Success College                                                                                                  2007 – 2008

West Africa Examination Council

 

Fins Academy Primary Schools                                                                                 1997 – 2001

Primary School Leaving Certificate

Experience
OFFSHORE INSPECTOR

Client: SONANGOL EP, ANGOLA

Contractor: PREIZOSO LINJEBYGG

Date: December 2019 – Present

ü  Perform surveys and Inspection on piping and pressure vessels – heat exchangers, fired heater

ü  Determine that the requirements of API 570 and 510 on inspection, examination and testing are met

ü  Perform Inspection for specific types of corrosion and cracking

ü  Perform visual inspection on piping and pressure vessel

ü  Perform Ultrasonic Thickness measurement on piping and vessels

ü  Prepare CAD Isometrics Inspection drawing

ü  Witness load test and hydrostatic test

 

NDT INSPECTOR

Client: TOTAL NIGERIA LTD, AKPO, Egina FPSO

Contractor: STANDARD TESTING AND INSPECTION SERVICES

Contract Type: Call out

Date: October – December 2019

ü  Perform visual inspection on piping and pressure vessel

ü  Perform Ultrasonic Thickness measurement on piping and vessels

 

TANK INSPECTOR

Client: Chevron Nigeria Ltd

Contractor: Broron oil and gas Nigeria ltd

Location: Escravos Gas to Liquid Plant

Date: July 2019 – September 2019

ü  Application of construction/Inspection Codes, Standards and Specifications.

ü  Material Verification and Identification.

ü  Interpretation of P&ID and ISO Drawings.

ü  Supervision of construction works

ü  Integrity Inspection of Piping, Pressure Vessels and Tanks.

ü  Welding inspection.

ü  Supervision of NDT personnel/process.

ü  Site Hazard Risk Assessment/analysis.

ü  Preparation of Summary report, Spreadsheet and Detailed Reports.

ü  Preparation of Site Inspection Data Sheets.

 

PINPING/MECHANICAL INSPECTOR

Client: EXXON MOBIL (Nigeria)

Contractor: OTAOILF Services Ltd

Project: Ubit GF Revamp

Date: Dec 2018 – June 2019

ü  Performed visual inspection on piping insulation

ü  Performed Ultrasonic Thickness measurement and MPI on piping and vessel

ü  Verified that welding inspection has been performed

ü  Verified that dimensions and alignment tolerances of the piping systems are as per construction specification

ü  Witness pressure testing on piping and pressure vessels

ü  Complete and endorsed all inspection records

 

ROPE ACCESS TECH

Client: TOTAL UPSTREAM COMPANY NIGERIA LTD

Contractor: SPIE/DragonFire

Project: Akpo FFSD

Date: Oct 2018 – Nov 2018

ü  Assisting construction crew – rigging, installation and removal of hoist, beam clamps and other rigging gears

ü  Assisted intervention team for confined space entry – standby rescue

ü  Removal of pipe spools, valves etc

 

WELDING QC INSPECTOR

Client: AMNI International Petroleum Development Company Ltd (Nigeria)

Contractor: OTAOILF Services Ltd

Project: Princess Aweni FPSO Crane welding repair

Date: July 2018 – August 2018

ü  Ensure that all operations are carried out in complete compliance with local, company or national safety legislation

ü  Ensure welding repairs are devoid of visual and structural defects

ü  Ensure that the repair procedures, WPS and other documents are adhered to

ü  Supervise all NDT to be carried out

 

API Inspector

Client: Belema oil

Contractor: Iro-Vester Engineering

Location: IDAMA Production Platform

Project: Inspection of well heads piping, Vessels and connected piping

Period: April 2018 – Present

ü  Performing integrity checks (internal and external visual inspection) on wellhead piping, risers, scrubbers, separators, Electrostatic heaters and their associated piping, flare and delivery lines.

 

NDT INSPECTOR

Client: Total Nig Plc

Contractor: IS Groupe Nigeria

Location: Total Depot, Blending plant & Tank farm, Lagos

Project: 10 years Internal and external inspection of aboveground storage tanks

Period: April 2017 – May 2017

ü  Performed UT thickness measurements on above ground storage tanks

ü  Performed VT and MPI on welded joint of the shell courses and bottom plate of tanks

 

API INSPECTOR

Client: NIGERIA LNG Bonny

Contractor: Russel Smith, NIGSA Energy

Project: Fixed Equipment Inspection.

Feb 2016 – February 2018

ü  Toke the technical lead on a daily basis, regarding all inspection work area such as pipe line, vessels, and tank and platform inspections.

ü  Used rope access to carry out visual inspection of pipe rack, trunnion, support, shoe supports, bracket support, bolts and nuts and other un-accessible static equipment, tanks and other structures.

ü  Provided daily direction to NDE Technicians.

ü  Wrote/reviewed inspection reports, plans, repair recommendations and other inspection documents.

ü  Verified that the integrity of the structure has been restored for the purpose it was designed for.

ü  Monitored, evaluated and ensured that all work was carried out safely.

 

API Inspector

Client: AGIP

Contractor: Jack-Paul oil and gas

Location: ABO FPSO

Project: Inspection of Vessels

Period: July 2018

ü  Perform inspection tasks and visual inspection of external and internal of process vessels –Test Separator, Dehydrator and Degassing vessels.

 

 

API 510/570 INSPECTOR

Client: SNEPCo

Contractor: NiGSA Energy/Dormanlong Engineering

Location: Bonga

Project: Bonga Turnaround 2017

Period: March 2017 – April 2017

ü  Performed visual inspection on horizontal and vertical vessel; Nitrogen Gas Receiver, Blow down Separator internal using boroscope.

ü  Performed Visual Inspection on Gas Meter flotation tubes using boroscope.

 

API INSPECTOR

RusselSmith Group

Clients: Chevron Nigeria Ltd (Agbami FPSO)

Project: Turn Around Maintenance

November – December 2016

Performed visual inspection on heat exchangers, Glass reinforced epoxy piping, flare line

 

TANK NDT INSPECTOR

Client: Petrolex

Project: Construction of Tanks

Period: August  – November 2016

Location: Petrolex Oil and Gas Ibefun, Ogun State

ü  Performed MPI, DPI and UT on bottom, annular plates

 

MIT  Verifification services limited

Project: Shutdown/statutory inspection of pressure vessels

Period: march – April 2016

Position:  Inspector

Location: MWOG flow station kwale

 

 

NDT Inspector

Clients: Chevron Nig. Ltd (Escravos, GTL), Afam VI power plant, SPDC

Contractor: Alfa Design Nig Ltd

January 2013 – November 2015

Job description:

ü  Planned and coordinated inspection and survey activities relating to structures.

ü  Corrosion, minimum thickness determination

ü  Ensured and checked that safety devices are operational and within calibration date

ü  Carried out Visual inspection on pressure vessel and process piping

ü  Prepared isometric inspection drawings of process piping.

ü  Prepared formal written reports of inspections.

ü  Interpreted and fields verified process P&IDs.

ü  Carried out UT Corrosion Mapping and defect scanning and sizing on vessels and piping, MPI and DPI on Various diameters of Pipelines

 

 

Experience

Prezioso lynjerbygg Luanda, Angola

Inspection Engineer - December 2019 - present