NDT or Inspection Qualification:

API 510 - PRESSEURE VESSEL INSPECTOR
CSWIP 3.1 - WELDING INSPECTOR
NDT LEVEL 2

¨ Performing Stage wise Inspections as per approved ITP/QAP.

¨ Review of Previous history of Equipments and hold points.

¨ Conducting Internal, External inspections and On – Stream Inspections of static equipment’s such as Pressure Vessels, Heat Exchangers, Columns, Heaters, Fin Fan Coolers as per the requirements.

¨ External Inspection of Static Equipment’s on Head, Shell, Nozzles,Corrosion Under Insulation,and check the Supporting Structures like Ladders, Platform, Supports etc.,

¨ Conducting  External CUI inspections on Piping, Pressure vessels, Heat Exchangers.

¨ Monitoring Ultrasonic Thickness Gauging (UTG)  on Vessels.

¨ Calculating Short Term, Long Term and Remaining Life of Equipments.

¨ Monitoring & Witness of  Hydro Tests and Pneumatic Tests and Calibration due dates.

¨ Performing Raw Material Inspection of Incoming Materials.

¨ Review of Material Test Certificates (MTC) accordance with applicable standards.

¨ Witness of Mechanical and Chemical Tests for incoming material like Tensile test, Impact Test, Bend test, Hardness Test, PMI Test etc., and acceptance as per applicable codes & standards.

¨ Performing Fit up & Dimensional Inspections as per the approved drawings.

¨ Inspection and Monitoring of Joint Preparation and Welding Process.

¨ Performing before – in process – after welding Inspections.

¨ Monitoring the Baking of welding consumables and preheating, inter pass and PWHT of welds.

¨ Experienced with various welding processes like; SMAW, GMAW, GTAW, SAW various types of joining materials like Carbon Steel, Stainless Steel, Low and Alloy steels.

¨ Witnessing of  NDT (RT, UT, MT, and PT) as per Project requirements.

¨ Reviewing & accepting NDT reports as per applicable codes &standards.

¨ Performing/Witnessing Leak Test on Weld Seams, RF pads for Nozzles as per approved Procedures.

¨ Monitoring & Witnessing of Blasting & Painting Inspection activities.

¨ Carrying out Painting Inspection activities i.e., checking of DBT, WBT, RH, MT, WFT, DFT,

¨ Monitoring & Witnessing of Salt Content Test, Pull out Test, Tape Adhesion Test, Holiday Test etc., as per Project requirement.

¨ Verifying and Validating Equipment Devices Calibration Records.

 

MANAGEMENT ACTIVITES

¨ Preparation & Review of ITP/QAP & Method Statement as per Project Specifications.

¨ Preparation & Qualifying of Procedure Qualification Record (PQR), Welding Procedure Specification (WPS) for Similar/dissimilar metals of different welding processes accordance with Standards & Project requirement.

¨ Qualifying Welders in different Positions, Welding Processes & Preparation of Welder Qualification Certificates as per applicable Codes & Standards.

¨ Preparing & Maintaining of all Quality Related Documents (Raw Material/ Fit up & Dimensional/ Welding/ Blasting & Painting Inspection Reports).

¨ Preparation & Submission of Dossier/ MRB (Manufacturer Record Book)/ SWCF after completion of Projects as per approved MRB Index.

¨ Preparation of Companies QA Manual & Supervision of all Amendments & Revisions.

¨ Performs all Internal & External Audits on behalf of company’s management.

¨ Implementation of QA/QC Management System.

¨ Conducting In house Management Review meetings regarding Quality aspects.

¨ Setting & Measuring Key Performance Indicators (KPI) for each Department in the Organization.

¨ Providing Training to welder’s accordance with project requirements.

¨ Coordinating with Third party for performing Testing’s as per project requirements.

¨ Follow up for closing out of Nonconformity by taking proper Corrective Action

¨ Monitoring &Maintaining of Corrective Action Register (CAR).

¨ Coordinating all quality related matters with Sub Vendors & Clients.

Maintaining of all Instruments Calibration Certificate

Experience

TUV REHILAND

API INSPECTOR - JAN -2022 /FEB -2022

INSERVICE INSPECTION OF PRESSURE VESSELS, HEAT EXCHANGERS, COLUMNS, FURNACE.
PERFORMING AS FOUND INSPECTIONS, POST CLEANING INSPECTIONS.
WITNESSING/MONITORING NDT ACTIVITIES – UTG, ECT, IRIS, DPT AND MPI.
WITNESSING HYDRO TEST, PNEUMATIC TESTS.
PREPARATION OF INSPECTION REPORTS FOR EACH STAGE OF INSPECTION.
CALCULATING REMAINING LIFE OF THE EQUIPMENT BY ASSESSING CORROSION ALLOWANCE.
REVIEWING OF NDT REPORTS.
ASSESSING DIFFERENT DAMAGE MECHANISMS DURING EXTERNAL AND INTERNAL INSPECTIONS.

INDUSPECT INDIA PVT

PLANT INSPECTOR - DEC-2021

INSERVICE INSPECTION OF PRESSURE VESSELS, HEAT EXCHANGERS, COLUMNS, FURNACE.
PERFORMING AS FOUND INSPECTIONS, POST CLEANING INSPECTIONS.
WITNESSING/MONITORING NDT ACTIVITIES – UTG, ECT, IRIS, DPT AND MPI.
WITNESSING HYDRO TEST, PNEUMATIC TESTS.
PREPARATION OF INSPECTION REPORTS FOR EACH STAGE OF INSPECTION.
CALCULATING REMAINING LIFE OF THE EQUIPMENT BY ASSESSING CORROSION ALLOWANCE.
REVIEWING OF NDT REPORTS.
ASSESSING DIFFERENT DAMAGE MECHANISMS DURING EXTERNAL AND INTERNAL INSPECTIONS.

CSCEC ENGINEERING LLC

QA-QC ENGINEER - OCT 2018 /NOV 2021

Performing Stage wise Inspections as per approved ITP/QAP.
Review of Previous history of Equipments and hold points.
Conducting Internal, External inspections and On – Stream Inspections of static equipment’s such as Pressure Vessels, Heat Exchangers, Columns, Heaters, Fin Fan Coolers as per the requirements.
External Inspection of Static Equipment’s on Head, Shell, Nozzles,Corrosion Under Insulation,and check the Supporting Structures like Ladders, Platform, Supports etc.,
Conducting External CUI inspections on Piping, Pressure vessels, Heat Exchangers.
Monitoring Ultrasonic Thickness Gauging (UTG) on Vessels.
Calculating Short Term, Long Term and Remaining Life of Equipments.
Monitoring & Witness of Hydro Tests and Pneumatic Tests and Calibration due dates.
Performing Raw Material Inspection of Incoming Materials.
Review of Material Test Certificates (MTC) accordance with applicable standards.
Witness of Mechanical and Chemical Tests for incoming material like Tensile test, Impact Test, Bend test, Hardness Test, PMI Test etc., and acceptance as per applicable codes & standards.
Performing Fit up & Dimensional Inspections as per the approved drawings.
Inspection and Monitoring of Joint Preparation and Welding Process.
Performing before – in process – after welding Inspections.
Monitoring the Baking of welding consumables and preheating, inter pass and PWHT of welds.
Experienced with various welding processes like; SMAW, GMAW, GTAW, SAW various types of joining materials like Carbon Steel, Stainless Steel, Low and Alloy steels.
Witnessing of NDT (RT, UT, MT, and PT) as per Project requirements.
Reviewing & accepting NDT reports as per applicable codes &standards.
Performing/Witnessing Leak Test on Weld Seams, RF pads for Nozzles as per approved Procedures.
Monitoring & Witnessing of Blasting & Painting Inspection activities.
Carrying out Painting Inspection activities i.e., checking of DBT, WBT, RH, MT, WFT, DFT,
Monitoring & Witnessing of Salt Content Test, Pull out Test, Tape Adhesion Test, Holiday Test etc., as per Project requirement.
Verifying and Validating Equipment Devices Calibration Records.

MANAGEMENT ACTIVITES
Preparation & Review of ITP/QAP & Method Statement as per Project Specifications.
Preparation & Qualifying of Procedure Qualification Record (PQR), Welding Procedure Specification (WPS) for Similar/dissimilar metals of different welding processes accordance with Standards & Project requirement.
Qualifying Welders in different Positions, Welding Processes & Preparation of Welder Qualification Certificates as per applicable Codes & Standards.
Preparing & Maintaining of all Quality Related Documents (Raw Material/ Fit up & Dimensional/ Welding/ Blasting & Painting Inspection Reports).
Preparation & Submission of Dossier/ MRB (Manufacturer Record Book)/ SWCF after completion of Projects as per approved MRB Index.
Preparation of Companies QA Manual & Supervision of all Amendments & Revisions.
Performs all Internal & External Audits on behalf of company’s management.
Implementation of QA/QC Management System.
Conducting In house Management Review meetings regarding Quality aspects.
Setting & Measuring Key Performance Indicators (KPI) for each Department in the Organization.
Providing Training to welder’s accordance with project requirements.
Coordinating with Third party for performing Testing’s as per project requirements.
Follow up for closing out of Nonconformity by taking proper Corrective Action
Monitoring &Maintaining of Corrective Action Register (CAR).
Coordinating all quality related matters with Sub Vendors & Clients.
Maintaining of all Instruments Calibration Certificate

ONYX INDUSTRIES FZC

QA-QC INCHARGE - JULY-2014/SEP-2018

Performing Stage wise Inspections as per approved ITP/QAP.
Review of Previous history of Equipments and hold points.
Conducting Internal, External inspections and On – Stream Inspections of static equipment’s such as Pressure Vessels, Heat Exchangers, Columns, Heaters, Fin Fan Coolers as per the requirements.
External Inspection of Static Equipment’s on Head, Shell, Nozzles,Corrosion Under Insulation,and check the Supporting Structures like Ladders, Platform, Supports etc.,
Conducting External CUI inspections on Piping, Pressure vessels, Heat Exchangers.
Monitoring Ultrasonic Thickness Gauging (UTG) on Vessels.
Calculating Short Term, Long Term and Remaining Life of Equipments.
Monitoring & Witness of Hydro Tests and Pneumatic Tests and Calibration due dates.
Performing Raw Material Inspection of Incoming Materials.
Review of Material Test Certificates (MTC) accordance with applicable standards.
Witness of Mechanical and Chemical Tests for incoming material like Tensile test, Impact Test, Bend test, Hardness Test, PMI Test etc., and acceptance as per applicable codes & standards.
Performing Fit up & Dimensional Inspections as per the approved drawings.
Inspection and Monitoring of Joint Preparation and Welding Process.
Performing before – in process – after welding Inspections.
Monitoring the Baking of welding consumables and preheating, inter pass and PWHT of welds.
Experienced with various welding processes like; SMAW, GMAW, GTAW, SAW various types of joining materials like Carbon Steel, Stainless Steel, Low and Alloy steels.
Witnessing of NDT (RT, UT, MT, and PT) as per Project requirements.
Reviewing & accepting NDT reports as per applicable codes &standards.
Performing/Witnessing Leak Test on Weld Seams, RF pads for Nozzles as per approved Procedures.
Monitoring & Witnessing of Blasting & Painting Inspection activities.
Carrying out Painting Inspection activities i.e., checking of DBT, WBT, RH, MT, WFT, DFT,
Monitoring & Witnessing of Salt Content Test, Pull out Test, Tape Adhesion Test, Holiday Test etc., as per Project requirement.
Verifying and Validating Equipment Devices Calibration Records.

MANAGEMENT ACTIVITES
Preparation & Review of ITP/QAP & Method Statement as per Project Specifications.
Preparation & Qualifying of Procedure Qualification Record (PQR), Welding Procedure Specification (WPS) for Similar/dissimilar metals of different welding processes accordance with Standards & Project requirement.
Qualifying Welders in different Positions, Welding Processes & Preparation of Welder Qualification Certificates as per applicable Codes & Standards.
Preparing & Maintaining of all Quality Related Documents (Raw Material/ Fit up & Dimensional/ Welding/ Blasting & Painting Inspection Reports).
Preparation & Submission of Dossier/ MRB (Manufacturer Record Book)/ SWCF after completion of Projects as per approved MRB Index.
Preparation of Companies QA Manual & Supervision of all Amendments & Revisions.
Performs all Internal & External Audits on behalf of company’s management.
Implementation of QA/QC Management System.
Conducting In house Management Review meetings regarding Quality aspects.
Setting & Measuring Key Performance Indicators (KPI) for each Department in the Organization.
Providing Training to welder’s accordance with project requirements.
Coordinating with Third party for performing Testing’s as per project requirements.
Follow up for closing out of Nonconformity by taking proper Corrective Action
Monitoring &Maintaining of Corrective Action Register (CAR).
Coordinating all quality related matters with Sub Vendors & Clients.
Maintaining of all Instruments Calibration Certificate

DECCAN NDT AND INSPECTIONS

INSPECTION ENGINEER - FEB 2010 TO JUNE 2014

Project: SHUTDOWN ACTIVITY
Client: HINDUSTAN PETROLEUM COOPERATION LIMITED
ORGANISATION : DECCAN INSPECTION AND NDT SERVICES.

Project: SHUTDOWN ACTIVITY
Client: INDIAN OIL COOPERATION LIMITED
ORGANISATION : DECCAN INSPECTION AND NDT SERVICES.

Project: SHUTDOWN ACTIVITY
Client: TATA PROJECTS LIMITED
ORGANISATION : DECCAN INSPECTION AND NDT SERVICES.

Project: SHUTDOWN ACTIVITY
Client: HMEL LIMITED – BHATINDA, PINJAB , MSK MANPOWER.
ORGANISATION : DECCAN INSPECTION AND NDT SERVICES.

Education

B.TECH IN MECHANICAL ENGINEERING

JAWAHARLAL TECHNOLOGICAL UNIVERSITY
2006 TO 2009

DIPLOMA IN AUTOMOBILE ENGINEERING

ANDHRA POLYTECHNIC
2001 TO 2004

Skills

  • AUDITING
  • COATING INSPECTION
  • QMS