Pipeline crawler positioning

Pipeline radiography puts the source on a self-propelled crawler inside the line, stopped in the plane of the girth weld and fired panoramically through the wall onto film wrapped round the outside. It is the fastest production radiography there is – one exposure per joint, complete coverage – but it depends on the source stopping accurately in the weld plane.

If the source stops short by e, the beam meets the weld at an angle beta = atan(e / (ID/2)) instead of perpendicular. The wall path stretches to wall / cos(beta), and the weld image is displaced and distorted. Requiring the path ratio to stay within k gives the stopping tolerance e_max = (ID/2) x tan(acos(1/k)). On a 300 mm bore at a 1.1 ratio that is about 69 mm – generous, which is why magnetic weld-crown detection or an external marker is sufficient in practice. On small bore it tightens quickly, because the tolerance scales with the radius.

The panoramic geometry also fixes the unsharpness with no room to negotiate. The source sits on the axis, so SOD = ID/2 and OFD = wall, giving Ug = F x wall / (ID/2). There is nothing to adjust: if the source is too big for the bore, the shot fails the ASME V T-274.2 limit and a smaller source or a different technique is required.

Production rate is the other half of the job. Cycle time per joint is travel plus exposure plus set-up and film handling, and on a long line the travel term between joints dominates the arithmetic that decides how many joints a shift will produce.

Worked example

Pipe outside diameter320 mm
Nominal wall thickness10 mm
Source size2.4 mm
Permitted through-wall thickness ratio1.1
Joint spacing12.2 m
Crawler travel speed18
Exposure time2 min
Set-up and film handling per joint1 min
Pipe inside diameter300 mm
Source-to-object distance (panoramic)150 mm
Axial stopping tolerance68.74 mm
Panoramic geometric unsharpness0.16 mm
ASME V allowable Ug0.508 mm
Travel time between joints40.67 s
Cycle time per joint3.68 min
Joints per hour16.31

ID = 320 - 20 = 300 mm, so the source sits 150 mm from the wall. A 1.1 thickness ratio allows beta = acos(1/1.1) = 24.62 degrees, giving e_max = 150 x tan(24.62) = 68.74 mm of axial tolerance. Ug = 2.4 x 10 / 150 = 0.160 mm, well inside the 0.508 mm limit. Travel is 12.2/18 = 0.678 min = 40.67 s, so the cycle is 0.678 + 2 + 1 = 3.68 min, about 16.31 joints per hour.

Use at your own risk — verify before you act

These calculators support, and never replace, the judgement of qualified NDT and engineering personnel. Results are provided as is, without warranty of any kind, express or implied, and must be independently verified against the governing code edition named in your contract before being used in any inspection, acceptance, rejection, radiation-safety or fitness-for-service decision. By using them you accept full responsibility for how the results are applied; NDT Inspect, its owners and contributors accept no liability for any loss, damage, injury or death arising from their use or from reliance on them. If a result matters to safety, check it by hand and have it reviewed by a competent person.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.