Bonding quality assessment

  • Started by william · 4 years ago
  • 2 replies
  • 3 voices
  • last reply 2 months ago

Posted 4 years ago

Dear sir,
We are bonding steel and titanium alloys and assessing the bonding quality at the interface of the two.

Is UT is mandatory for interface quality?

The item is meant for critical aerospace usage

2 replies

4 years ago

If you are doing this process, you should have a procedure to go along with it. What does your bonding verification method say about that?

2 months ago

For adhesive bonding of dissimilar metals like steel and titanium in aerospace applications, the specific inspection methods required depend on your written procedure and the applicable aerospace standard or specification.

UT (ultrasonic testing) can detect voids and delaminations at the bond line and is commonly used for bondline inspection, but it is not always mandatory as the sole method. The governing factors are:

- Your bonding procedure specification (BPS) or work instruction, which should define the inspection method, acceptance criteria and sampling plan
- The aerospace standard or customer specification you are working to — for example, NASA, BAe, Airbus or similar — which often references adhesive bonding standards such as ASTM D4562 or similar
- The criticality of the joint and the failure modes of concern

Other methods used alongside or instead of UT for bondline quality include thermography, tap testing, pull-off adhesion testing (destructive) and X-ray or other imaging. Some procedures use a combination of non-destructive and destructive testing.

The key is that your bonding verification method — whether UT, another NDT method, or a mix — must be documented in your procedure before you start production. The procedure should also define acceptance criteria, reject/rework decisions, and documentation requirements.

If your procedure is not yet written or if you are unsure what your customer specifies, contact them or refer to the relevant aerospace standard. Jaden is right: your procedure is the starting point for this decision.

More in Quality Control

All discussions in this board

966 discussions · 392 answers

Latest forum discussions

Petrochemical plant with distillation columns

Join free

Join 5,483 NDT professionals for free

Groups, forum, resume upload, vacancy alerts and the member directory — no charge.

Sponsors of NDT Inspect
Magnaflux
Sponsor slot open