Inspection technician working on pipework at an industrial plant

What’s new

The NDT community, live

Updates, photos, documents and polls from members, groups and companies — join the conversation.

The NDT Inspect community

What’s new

  • 37 posts this week
  • 0 online now
  • 5,507 members

What’s new on NDT Inspect

Latest NDT & inspection industry news, jobs and community updates

Live updates from the NDT Inspect community: new NDT job vacancies, product launches from the virtual exhibition, forum discussions and member activity across ultrasonic, radiographic, phased array and every other inspection method. Join free to post and follow.

Share an update with 5,507 NDT professionals…Join free

Members post updates, comment, react and follow the companies they work with. Already a member? Sign in

  • mr_hari_dme_
    mr_hari_dme_ joined as QA QC Professional
    2 months ago
    Community
    Comment Share
  • Rambabu Hanumanthu
    Rambabu Hanumanthu joined as NDT Professional
    2 months ago
    Community
    Comment Share
  • BILLEL BOUMEKHILA
    BILLEL BOUMEKHILA joined as Standard Member
    2 months ago
    Community
    Comment Share
  • BINITH CHOUDHURY
    BINITH CHOUDHURY joined as Standard Member
    2 months ago
    Community
    Best method?
    UT100%
    RT0%
    PT0%
    1 vote · closed
    Comment Share
  • Anshad Ali N
    Anshad Ali N joined as Standard Member
    2 months ago
    Community
    Comment Share
  • ANDT-Inspection
    ANDT-Inspection joined as NDT Professional
    2 months ago
    Community
    Comment Share
  • Harley Dunnington
    Harley Dunnington joined as Standard Member
    2 months ago
    Community
    Comment Share
  • Lauren Carroll
    Lauren Carroll joined as Standard Member
    2 months ago
    Community
    Comment Share
  • RAJASEKAR
    RAJASEKAR joined as NDT Professional
    2 months ago
    Community
    Comment Share
  • Maran Kabilan
    Maran Kabilan joined as Inspector
    2 months ago
    Community
    Comment Share
  • Eleno Garza
    Eleno Garza joined as Standard Member
    2 months ago
    Community
    Comment Share
  • James Martin
    James Martin joined as Standard Member
    2 months ago
    Community
    Comment Share
  • Ortega
    Ortega joined as Student Member
    2 months ago
    Community
    Comment Share
  • Ashton Barron
    Ashton Barron joined as NDT Professional
    2 months ago
    Community
    Comment Share
  • usamashaikhss
    usamashaikhss joined as Inspector
    2 months ago
    Community
    Comment Share
  • Joni Mart sitio
    Joni Mart sitio joined as QA QC Professional
    2 months ago
    Community
    Comment Share
  • Daniel Vale
    Daniel Vale joined as NDT Engineer
    2 months ago
    Community
    Comment Share
  • Ashish Gerola
    Ashish Gerola joined as Standard Member
    2 months ago
    Community
    Comment Share
  • Noyal Sathya
    Noyal Sathya joined as Standard Member
    2 months ago
    Community
    Comment Share
  • manohar
    manohar joined as NDT Engineer
    3 months ago
    Community
    Comment Share
  • KARTHIKEYAN_API-INSPECTOR
    KARTHIKEYAN_API-INSPECTOR joined as Inspector
    3 months ago
    Community
    Comment Share
  • VIS_Global_82756
    VIS_Global_82756 started the discussion Vietnam Supplier Quality: Control the Process, Not Only the Final Shipmenty
    3 months ago
    Discussion

    Vietnam Supplier Quality: Control the Process, Not Only the Final Shipment

    By VIS Global Editorial Team

    Vietnam is an important manufacturing and sourcing location for international buyers, but changing the country of production does not change the fundamentals of supplier quality. A polished quotation, an attractive sample, or a successful first shipment is not proof that a factory can consistently control materials, processes, subcontractors, and production changes.

    The central lesson is simple: buyers should manage quality as a process, not as a final checkpoint.

    Final inspection remains useful, but it occurs after most purchasing, material, labor, and scheduling decisions have already been made. If a defect is systematic—incorrect material, an uncontrolled process parameter, weak workmanship instructions, or an unapproved subcontractor—discovering it only when the goods are packed leaves fewer practical options. Rework may delay shipment, replacement may disrupt sales plans, and accepting the goods may transfer the problem to customers.

    A stronger Vietnam quality program begins before production.

    Start by translating expectations into verifiable requirements

    Purchase orders often contain commercial details but leave product quality open to interpretation. Expressions such as “export quality,” “same as approved sample,” or “high-grade material” are difficult to verify consistently. Buyers should instead create a controlled specification package covering dimensions, materials, performance requirements, labeling, packaging, workmanship, approved samples, defect classifications, and applicable test methods.

    The requirements should distinguish three separate questions: What must the product do? How will conformity be verified? What happens when a result is outside the agreed limit?

    This distinction is particularly important when a product will be placed on the Vietnamese market or when Vietnamese requirements form part of the contract. Vietnam’s Law on Product and Goods Quality distinguishes between products managed on the basis of declared applicable standards and potentially unsafe products managed under relevant technical regulations. The law also defines testing, inspection and certification as different conformity-assessment activities. Buyers should therefore identify the product-specific legal route rather than treating a general inspection report as evidence of every form of compliance.

    Verify the production system behind the sample

    A pre-order supplier audit should test whether the proposed factory can reproduce the approved result under normal production conditions. The audit should go beyond collecting certificates. It should examine the actual manufacturing site, equipment, production flow, incoming-material controls, calibration practices, employee instructions, nonconforming-product handling, traceability, subcontracting, and corrective-action records.

    The objective is not to produce a decorative audit score. It is to identify which controls are dependable, which depend on individual employees, and which do not yet exist.

    A factory may have technically capable machinery while lacking disciplined change control. Another may document procedures well but fail to segregate rejected material. Buyers should convert such findings into an action plan with named responsibilities, objective evidence, and completion dates. Critical gaps should be closed before mass production, not merely noted for a future visit.

    Put inspection points where risk enters the process

    Inspection timing should follow product risk. Incoming-material checks are valuable when material grade, color, components, or packaging affect the final result. First-article verification can confirm that the production setup matches the approved specification. During-production inspection can reveal whether process drift, operator variation, or changing inputs are creating repeated defects. Pre-shipment inspection can then evaluate finished quantity, workmanship, function, labeling, packaging, and other agreed characteristics.

    This sequence does not mean that every order requires every inspection type. A simple repeat product from a proven supplier may justify a lighter plan. A new factory, complex assembly, short launch schedule, safety-related characteristic, or history of inconsistent results deserves stronger controls.

    The key is to document why each control point exists. Inspection should answer a defined risk question, not simply create another report.

    Make evidence usable for decisions

    A useful quality report must connect observations to contractual requirements. It should identify the inspected product and order, sampling method, specification revision, test equipment, results, defect classifications, photographs, and unresolved deviations. Ambiguous statements such as “quality generally acceptable” should not replace measurable findings.

    Buyers also need decision rules before an inspection begins. Who may approve a deviation? Can a failed characteristic be reworked? Is reinspection required? Must repaired units be separated from untouched production? Without agreed rules, commercial urgency can turn every failure into an improvised negotiation.

    Data should also be compared across orders. Repeated minor defects, recurring packaging damage, or frequent last-minute specification questions may reveal a process weakness even when individual shipments are accepted. Trend review allows the buyer and supplier to address causes rather than repeatedly sorting symptoms.

    Separate product verification from regulatory approval

    Third-party inspections, factory audits, laboratory tests, and regulatory conformity procedures can support one another, but they are not interchangeable. Vietnam’s national standards and quality authority describes a state-management system covering standards, technical regulations, conformity assessment, accreditation, metrology, and product-quality responsibilities. The applicable route depends on the product and intended market.

    For that reason, buyers should confirm current requirements with the responsible Vietnamese authority or qualified regulatory specialist for the specific product. They should not assume that an overseas certificate, a supplier declaration, or a passed commercial inspection automatically satisfies a Vietnamese technical regulation.

    Build supplier improvement into the commercial relationship

    Quality improves when expectations and consequences are predictable. Supplier agreements should define access for inspection, notification of material or process changes, approval of subcontractors, record retention, corrective-action timelines, and responsibility for verified nonconformity costs. Performance reviews should consider responsiveness and recurrence, not only the percentage of accepted shipments.

    The best suppliers are not those that claim never to encounter defects. They are those that detect problems early, protect affected material, investigate causes honestly, and prevent recurrence.

    For companies sourcing from Vietnam, the objective should not be to inspect quality into a finished shipment. It should be to create a controlled chain of evidence from supplier selection through production and release. That approach gives both buyer and factory a clearer basis for decisions—and makes quality more repeatable.

    About the author

    VIS Global provides testing, inspection, auditing and certification-related services, including supplier verification, factory audits and product inspections in Vietnam and other Asian sourcing markets. More information is available at https://visgl.com/.

    Sources

    Vietnam Government Portal — Law No. 05/2007/QH12 on Product and Goods Quality: https://vanban.chinhphu.vn/?classid=1&docid=51259&pageid=27160&typegroupid=3

    Vietnam National Commission for Standards, Metrology and Quality: https://tcvn.gov.vn/general-introduction/10/08/2022/?lang=enaan

    Comment Share
  • NDT Inspect (admin)
    NDT Inspect (admin) posted an update
    3 months ago
    Update

    NEW: 193 NDT calculators are now live on NDT Inspect.

    Every method — UT beam geometry and angle-beam trig, ToFD setup with proper compression-wave maths, PAUT apertures and scan speeds, radiography exposure and radiation safety, MT amp-turns, PT dwell times, eddy current depth of penetration, plus welding, hardness and fitness-for-service tools.

    Each one shows the governing formula, a worked example and the standard it comes from. 12 are free for everyone to use right now — members get the full set with live inputs, saved presets and CSV export.

    Try them: /calculators/

    Comment Share
  • VIS_Global_82756
    VIS_Global_82756 joined as Standard Member
    3 months ago
    Community
    Comment Share
  • Jose Campos
    Jose Campos joined as NDT Professional
    3 months ago
    Community
    Comment Share
Sponsor of NDT InspectSponsors keep NDT Inspect free for its members