ASME B31.3 ACCEPTANCE CRITERIA
ASME B31.3 Acceptance Criteria 344.6.2 Acceptance Criteria. Acceptance criteriashall be as described in (a) or (b).(a) A linear-type discontinuity is…
3 years ago
ASME SEC-V : 2019 /ASME SNT TC 1A-2016 Edition NDT Audit
I have been thru many ASME Audits for Fossil and Nuclear work from the manufactuer's side.To answer your questions:A) Auditor is absolutely correct.B) VT must…
5 years ago
ASME B31.3 ACCEPTANCE CRITERIA
1. It must be linear indication2. The indication level must be above reference level3. Comply with Rejectable length.First of all, where does it state in ASME…
5 years ago
ISO 17636 1 (2013) - Single wall technique / IQI film side / IQI selection
Hi Joss,I see your point. My understanding is that if you cannot use on source side, then, same IQI could be used on film side. But it sounds a bit strange.…
5 years ago
ISO 17636 1 (2013) - Single wall technique / IQI film side / IQI selection
Hi, According to ISO 17636, For exposures in accordance with 7.1.6 and 7.1.7, the IQI type used can be placed either on the source or on the film side. If the…
5 years ago

955 discussions · 371 answers

Latest forum discussions

Open the forum
Tanker passing an industrial plant at sunset

Exhibition

Walk the virtual NDT exhibition

10 interactive company stands with products, videos and documents.

Sponsors of NDT Inspect
Magnaflux
Sponsor slot open