Yes, phased array ultrasonic testing can replace radiography under most major construction codes, including ASME Section VIII, ASME B31.3, API 650, API 1104 and AWS D1.1. It is never a like-for-like swap. The codes that allow it attach conditions: encoded scanning with recorded data, a written scan plan, a procedure demonstrated on a block containing real flaws, trained personnel, and acceptance criteria written for ultrasonics. Manual phased array, where the operator watches a live screen and records nothing, does not qualify under the ASME pressure vessel rules.
Key points
- The permission sits in the construction code, not in ASME Section V. Section V tells you how to examine; the referencing code tells you whether UT may stand in for RT.
- Encoded data is the common thread. The record is what replaces the film.
- Acceptance criteria change with the method. A weld is not judged to radiographic limits from an ultrasonic scan.
- Radiography still has the advantage on thin wall, small bore and rounded flaws.
Why the question keeps coming up
Radiography stops work. An exclusion zone has to be set up and cleared, so shots move to night shift, and the schedule pays for it. Film needs processing, storage and a viewer. As wall thickness goes up, exposure times grow and sensitivity falls. Phased array has no radiation boundary, gives a result in minutes, and is better at finding the planar flaws that matter most: cracks and lack of fusion.
Radiography has strengths of its own. It gives an image most engineers can read, it shows porosity and slag clearly, and it works on thin-wall small-bore pipe where ultrasonics struggles. The useful question is which method suits the weld in front of you.

What each code allows
| Code | Where to look | What it allows |
|---|---|---|
| ASME Section VIII, Division 1 | UW-51(a)(4) and UW-53, pointing to Division 2, paragraph 7.5.5 | UT in place of required RT for welds where the thinner member is 6 mm (1/4 in.) or more |
| ASME Section VIII, Division 2 | Paragraph 7.5.5 | UT in lieu of RT with automated or semi-automated scanning, computer-based data acquisition and fracture-mechanics-based flaw acceptance tables |
| ASME B31.3 | 341.4.1(b)(1), 344.6, Appendix R | Random UT as an alternative to random RT; standard criteria in 344.6.2, alternative criteria for encoded UT in Appendix R |
| API 650 | Annex U | UT in lieu of RT for tank shell welds above the annex's minimum plate thickness, using automated, computer-based data acquisition |
| API 1104 | Sections 9 and 11 | Manual or automated UT of pipeline girth welds when the company specifies it |
| AWS D1.1 | Clause 8 and Annex H | UT is already a primary method; Annex H sets the rules when phased array is used in place of conventional UT |
ASME pressure vessels: from Code Case 2235 to the code book
The modern rules trace back to Code Case 2235, approved in 1996. It first allowed ultrasonic examination in lieu of radiography for heavy-wall vessels, and later revisions brought the minimum thickness down from 4 in. to 1/2 in. and added acceptance criteria for multiple flaws. Its provisions have since moved into the code itself. Division 1 now sends you from UW-51(a)(4), through UW-53, to Division 2, paragraph 7.5.5, and the technique requirements sit in ASME Section V, Article 4, including its mandatory appendices for workmanship-based and fracture-mechanics-based acceptance criteria.
The point that catches people out: the examination must be automated or semi-automated, with computer-based data acquisition. A technician sweeping a phased array probe by hand over the weld is doing a useful examination, but it is not one the code accepts in place of RT.
ASME B31.3 process piping
B31.3 has allowed ultrasonics as an alternative to radiography for years. Paragraph 341.4.1 lets the required 5% random examination be done by either method. The standard UT acceptance rule in 344.6.2 is based on amplitude and length. Appendix R, which started as B31 Code Case 181, gives fracture-mechanics-based criteria for encoded examination where flaws are sized in height and length. The two sets of criteria behave differently, and our guide to the ASME B31.3 acceptance criteria explains the difference.
API 650 tanks and API 1104 pipelines
API 650 Annex U covers ultrasonic examination in lieu of radiography for shell welds, and is the route by which TOFD and phased array reach large tank projects. API 1104 treats ultrasonic testing as an option the company may specify, and automated UT of girth welds has been standard on major pipeline spreads for decades, often with engineering-critical-assessment criteria in place of workmanship limits.
AWS D1.1 structural steel
AWS D1.1 is a different case, because ultrasonics is already a primary volumetric method for structural welds. The question there is phased array in place of conventional UT. The bridge code, AWS D1.5, added phased array in its 2015 edition, and D1.1 followed in 2020 with Annex H. Annex H calls for encoded line scanning with a documented scan plan and covers groove welds from 5 mm to 200 mm (3/16 in. to 8 in.).
ISO and EN
Outside the American codes the building blocks are ISO 13588 (phased array testing of welds) with ISO 19285 for acceptance levels, and ISO 10863 (TOFD) with ISO 15626. ISO 17635 sets the general rules for choosing methods. Whether they may replace radiography on a given job is decided by the product standard and the contract.
The conditions that catch people out
- Encoded scanning. Position-encoded data that can be reviewed later is the requirement common to the ASME, API 650 and AWS rules.
- A scan plan. The plan shows probe positions, angles and focal laws, and proves that the weld volume and heat-affected zone are covered. The PAUT weld bevel coverage calculator is a quick check on the geometry.
- A demonstrated procedure. The procedure is proved on a qualification block of similar thickness and geometry containing known flaws, usually near both surfaces and mid-wall.
- Qualified people. UT Level II or III alone is not enough. The codes expect specific training and demonstrated ability with the equipment and the analysis software.
- Acceptance criteria built for UT. Flaws are sized by height and length and compared with tables that depend on thickness. The decision no longer rests on naming the flaw type from an image.
- Thickness and material limits. Each code sets a lower thickness limit. Coarse-grained materials such as austenitic stainless welds and dissimilar joints need their own procedure qualification.
- Agreement. The owner, and the Authorized Inspector where one is involved, must accept the change before production, and the inspection and test plan must say so.
Where radiography still wins
- Thin wall and small bore. Below the code thickness limits, and on small-diameter butt welds with little room for a probe, radiography remains the practical choice.
- Rounded flaws. Porosity and slag are easier to see, count and measure against code charts on a radiograph.
- Coarse-grained welds. Austenitic and nickel-alloy welds scatter and bend ultrasound. They can be examined, but the qualification effort is much larger.
- Digital radiography. Computed and digital detector systems cut exposure times and remove chemical processing, which narrows the schedule gap.
Expect the results to differ
Switching method changes what is found. Phased array, particularly when paired with TOFD, finds more planar flaws than radiography: tight lack of fusion, and cracks that do not line up with the beam. Radiography finds more small rounded flaws. A fabricator who moves from RT to PAUT in the middle of a project often sees the repair rate change, and the direction depends on what the welders were producing. A short trial where both methods examine the same welds, agreed in advance, removes a lot of later argument.
The companion guide to weld defects and the NDT methods that find them has a detection table for each flaw type.
How to propose the switch
- Confirm that the construction code and the contract specification permit UT in lieu of RT for these welds.
- Get the owner's agreement in writing, and the Authorized Inspector's where the code requires it.
- Write the procedure and scan plan to ASME Section V, Article 4 or the standard the code names.
- Build or source a demonstration block and run the procedure qualification.
- Put the personnel records together: certification, equipment-specific training and demonstration results.
- State the acceptance criteria in the inspection and test plan.
- Agree how data files will be stored, for how long, and who can review them.
For the technique itself, see the sample PAUT procedure, the explainer on PAUT and the total focusing method, and the maximum PAUT scan speed and TOFD probe centre separation calculators.
Where inspectors disagree
- Is a fracture-mechanics table that accepts a small planar flaw a step forward from the old rule of no lack of fusion, or a step back?
- Should the technician who collected the data also be the one who analyses it, or should analysis be independent?
- On small-bore piping, is the right answer phased array with a low-profile scanner, digital radiography, or staying with film?
The Phased Array group and the Radiography group see these from opposite sides. If you have run both methods on the same welds, your numbers are worth sharing there.
PAUT in lieu of RT FAQ
Can PAUT replace RT under ASME Section VIII?
Yes. Division 1, UW-51(a)(4) allows ultrasonic examination in place of required radiography for welds where the thinner member is 6 mm (1/4 in.) or more, provided the examination meets Division 2, paragraph 7.5.5. That means automated or semi-automated scanning with computer-based data acquisition, a demonstrated procedure and the code's flaw acceptance tables.
Is manual phased array acceptable in lieu of radiography?
Not under the ASME pressure vessel rules, which require automated or semi-automated scanning with recorded data. Manual phased array is a valid examination, but it does not substitute for required radiography.
What is Code Case 2235?
An ASME Boiler and Pressure Vessel Code case, first approved in 1996, that allowed ultrasonic examination in lieu of radiography using fracture-mechanics-based acceptance criteria. Its provisions have since been incorporated into the code, so current work refers to the code paragraphs.
Is TOFD required when PAUT replaces radiography?
The codes do not always require it, but phased array and TOFD are commonly run together. TOFD is strong on through-wall height sizing and mid-wall flaws; phased array covers the near-surface zones where TOFD is weak. Together they make the coverage demonstration easier to pass.
What is the minimum thickness for UT in lieu of RT?
It depends on the code: 6 mm (1/4 in.) under ASME Section VIII and 5 mm (3/16 in.) for phased array under AWS D1.1 Annex H. API 650 Annex U sets its own lower limit for shell plate. Check the edition in your contract.
The short version
The codes allow it. The conditions are encoded data, a scan plan, a demonstrated procedure, trained people, ultrasonic acceptance criteria and the owner's agreement. Meet those and phased array is a legitimate replacement for radiography on most welds above the thickness limits. Skip any of them and it is only an extra examination.
Phased array and TOFD roles are posted regularly on the NDT jobs board.
Standards referred to: ASME Boiler and Pressure Vessel Code, Section V (Article 4) and Section VIII, Divisions 1 and 2; ASME B31.3; API 650 (Annex U); API 1104; AWS D1.1/D1.1M (Annex H) and AASHTO/AWS D1.5; ISO 13588, ISO 19285, ISO 10863, ISO 15626 and ISO 17635. Paragraph and annex numbers move between editions. This guide is a summary; the edition of the code named in your contract governs.















0 comments
Sign in to join the discussion.